\
Delivering maximised cooling with minimum investment: The organized sector advantage
High-efficiency air cooling slashes AC operating costs by 1/8th with minimum ducting changes
Air cooling 70,000 sq. ft. for maximised worker comfort and productivity
L&T Turbine factory air cooled 51,000 sq. ft. of area to combat heat and increase worker productivity.
Chokhi Dani air cooled a total area of 60,000 sq ft to increase productivity
 
X
 
X
 
X
 
X
Hello World!